Monthly Archives: November 2020

Feromihin’s first time participation in Online Congress

TOGC 2020 is the annual closed-door Congress dedicated to oil and gas transportation via pipelines including the questions of pipelines automation and digitalization, asset integrity, pipeline construction in challenging conditions, predictive analysis, the cost-effectiveness of the projects and many others. TOGC is a platform for networking between specialists from the leading pipeline operators, oil and […]

First casing filling with Stopaq® Casing Filler in Croatia

During October 2020 Zemis d.o.o.,hired as subcontractor by contractor Monter SM d.d. on the project Construction of the main pipeline Zlobin – Omišalj DN 800/100 – turnkey for the client Plinacro d.o.o., performed sealing the ends of the casings at 5 locations of the pipeline and filling the annular space between the casing and gas pipeline at […]

Skip to content