Monthly Archives: January 2021

Emergency intervention on the repair of the leak of the buried gas pipeline DN450

On 06.01. Zemis d.o.o. successfully participated in the emergency intervention on the repair of the leak of the buried gas pipeline DN450 with a working pressure 6 bar connecting MRS Sisak and TE-TO Sisak. Due to the impossibility of interrupting the operation of the gas pipeline due to the supply of the TE-TO Sisak plant, […]

Skip to content