Emergency Intervention on the Repair of the Leak of the Buried Gas Pipeline DN450

emergency intervention

On January 6, Zemis d.o.o. successfully performed an emergency intervention to repair a leak in a buried gas pipeline DN450, with a working pressure of 6 bar, connecting MRS Sisak and TE-TO Sisak.

The repair was conducted online due to the necessity of maintaining the gas pipeline’s operation for the TE-TO Sisak plant’s supply.

For the online repair, Zemis d.o.o. utilized the 3X Engineering Stopkit® 100, a specialized Emergency Pipeline Repair System designed for online leak sealing.

The quick intervention ensured the repair was completed in the shortest possible time, guaranteeing the continuous supply of natural gas to TE-TO Sisak.

Skip to content